Disclosure: this site is operated by Alpha Contractors LLC, a licensed and insured contractor based in Tallahassee.
When a commercial lease is signed, the move-in date is usually fixed. Painting is one of the last trades in a tenant improvement (TI), so any delay earlier in the job lands on the painter's schedule.
Know what the lease requires
Many leases name a "building standard" finish: one wall color, one ceiling white, and a specific sheen. Tenants may request accent walls or brand colors at their own cost. Get those choices in writing before ordering paint.
Sequence the trades
- Framing and drywall hanging
- Taping, finishing and sanding
- Prime coat, then ceilings and walls
- Flooring and fixtures
- Final coat touch-ups and punch list
Painting before flooring avoids drips on new carpet or LVP; the last touch-ups happen after installers leave.
Plan the punch list
Electricians, cabinet installers and movers all scuff walls. Budget a short return visit for touch-ups before the tenant gets the keys.
One crew for drywall and paint
For TI work in Tallahassee, our crews are run by Alpha Contractors, which also handles framing, drywall and flooring, so fewer trades have to be coordinated. Call or text (850) 616-8366 with your move-in date.